Work Session Report ? Saturday, June 19, 2010

Track 2, taken from the sand tower work platform is ready for spiking.

The 2 man track gang was out in force today.? Steve and I managed to get another 4 sticks of 80lb rail laid out, and ready for spiking.? We are now across the yard access road, and have built a small temporary crossing.? This will allow CN to cross our tracks, but we will replace it with a better crossing in the future.? The Plymouth now has all 4 engineer side windows removed, and they will be replaced as time and funds permit.? Still have 7 more windows to remove and replace, but these were the worst ones damaged in the vandalism attack.? The next work session at the Niagara Railway Museum will be Wednesday, June 23, 10am.? There will be people coming and going throughout the week, but if you want to be there when we are working, drop us a line to confirm.

Looking west down track 1 towards our new temporary crossing.