NRM Banner

July 11, 2010

Productive weekend

Despite more damage to the shop last week, it was still a productive weekend. Work continued on our 2 shop tracks, with track 1 compromise bars being changed to the correct weights, and track 2 has been gauged and spiked up to the start of the 80lb rail. The 80lb rail?will be finished up through the week. The problem now is we are running out of rail. We still need about 300ft of track (600ft of rail) to complete the tracks to where the switch will eventually end up on the CN. ?This includes 1 turnout to connect track 1 & 2, which is the track construction for phase 1.

NRM Site Track Plan